Bid Results

Louisville Water Company provides a 6-month bid history online. You can also visit the ePlanroom for current bid opportunities. If you need more information, contact Procurement Services.

Bids Under Review: ***The presence of bid tabulations is not an express or implied representation by the Louisville Water Company, and must not be interpreted as a guarantee, endorsement, or warranty of contract award and may not result in contract award. Bids with status currently "Under Review" require approval(s) before final contact award is authorized.***

Open Date Bid No. Bid Title Buyer Status
11/28/2018 18-119 Glaser Lane Area Water Main Replacement Project Robin Heitz Under Review
10/21/2018 18-113 Springhill Road Area Water Main Replacement Project Terri Conner Under Review
10/21/2018 18-110 Taylorsville Bardstown Road Master Meter Renovation Project Terri Conner Under Review
10/21/2018 18-112 Southland Blvd.MRRP Renee Fromme Under Review
10/17/2018 18-96 Concrete Paved Services Terri Conner Awarded
10/10/2018 18-98 Hdro-Vac Excavator Truck Renee Fromme All Bids Rejected
9/19/2018 18-95 HVAC, Inspection, Maintenance, & Repairs Renee Fromme Awarded
8/22/2018 18-70 Casing Spacers Renee Fromme Awarded
8/15/2018 18-89 Copper Tubing Renee Fromme Awarded
8/15/2018 18-73 Carbon Fiber-Reinforced Polymer Repairs on Large Diameter Water Mains Terri Conner Awarded
8/15/2018 18-74 External Post-Tensioning Tendon Repairs on Large Diameter PCCP Water Main Terri Conner Awarded
8/01/2018 18-76 Water Treatment Chemicals Renee Fromme Awarded
7/18/2018 18-75 Swing Check Valves Carol Lyons Awarded
7/11/2018 18-80 48" Bell Joint Clamps Carol Lyons Awarded
6/27/2018 18-65 Polywrap Carol Lyons Awarded
6/20/2018 18-50 Janitorial Services Renee Fromme Awarded
6/13/2018 18-69 South Park BPS and Hollyvilla PRV Weathertightness Improvements Terri Conner Awarded
6/6/2018 18-71 Hydraulic, Machine & Gear Oils Terri Conner Awarded
6/6/2018 18-66 Parkridge Tank Coatings & REnovation Renee Fromme Awarded
5/16/2018 18-22 Mitchell Hill Road Water Main Replacement Renee Fromme Awarded
5/16/2018 18-63 Forest Park Drive Area Water Main Replacement Robin Heitz Awarded
5/09/2018 18-64 10 Yard Mobile Mixing Concrete Truck Renee Fromme Awarded
5/2/2018 18-59 Bush Farm Road Grid Tie Renee Fromme Awarded
5/2/2018 18-19 Uniforms Robin Heitz Awarded
4/18/2018 18-55 Inspection, Maintenance & Repair of Elevators at Louisville Water Company Terri Conner Awarded
4/11/2018 18-57 Allmond Avenue Warehouse Racking Equipment Terri Conner Awarded
4/11/2018 18-58 Cement Robin Heitz Awarded
4/11/2018 18-48 Electro-Mechanical Renee Fromme Awarded
3/28/2018 18-52 Aluminum Hatches Terri Conner Awarded
3/28/2018 18-51 Flat Faced Flanged Spool Pieces Terri Conner Awarded
3/28/2018 18-28 Windsor Place Area Lead Service Renewal Project Robin Heitz Awarded
3/21/2018 18-49 I-64 36 Inch Steel Impressed Current Cathodic Protection System Installation Terri Conner Awarded
3/14/2018 18-31 Distribution System Repairs and Capital Improvements Terri Conner Awarded
3/7/2018 18-17 Shelburn Drive Area Water Main Replacement Renee Fromme Awarded
3/7/2018 18-29 Emil Avenue Lead Service Renewals Renee Fromme Awarded
3/7/2018 18-25 Eastern Parkway 48" Transmission Main Rehabilitation Phase 2B Robin Heitz Awarded
2/28/2018 18-27 Central Avenue ARea Lead Service Renewals Project Renee Fromme Awarded
2/28/2018 18-26 Woodlawn Avenue Area Lead Service Renewals Project Terri Conner Awarded
2/28/2018 18-21 Rustic Way Area Water Main Relacements Robin Heitz Awarded
2/21/2018 18-20 Southwestern Parkway Area Water Main Replacement Project Terri Conner Awarded
2/14/2018 18-08 South 4th Street Area Lead Service Renewals Robin Heitz Awarded
2/14/2018 18-07 Forrest Street Area Lead Service Renewals Terri Conner Awarded
2/14/2018 17-159 Blankenbaker Parkway Water Main Replacements Robin Heitz Awarded
2/7/2018 18-02 Temporary Personnel and Direct Hire Placement Services Terri Conner Awarded
2/7/2018 18-12 Seelbach Avenue MRRP Renee Fromme Awarded
2/7/2018 18-11 Farmington Avenue Water Main Replacement Project Terri Conner Awarded
2/7/2018 18-06 West Oak Street Area Lead Service Renewals Renee Fromme Awarded
2/7/2018 18-05 Hawthorne Avenue Area Lead Service Renewals Robin Heitz Awarded
1/31/2018 18-03 Glenmary Avenue Area Lead Service Renewals Terri Conner Awarded
1/31/2018 18-04 Macon Avenue Area Lead Service Renewals Robin Heitz Under Review
1/31/2018 18-09 Rivercrest Drive MRRP Renee Fromme Awarded
1/31/2018 18-10 Virginia Avenue Area Water Main Repacements Robin Heitz Awarded
1/24/2018 18-16 Long Run Park Road and Shelbyville Road Grid-Ties Project Terri Conner Awarded
1/26/2018 18-15 Ductile Iron Pipe Restrained Joint Gaskets Renee Fromme Awarded
1/10/2018 18-14 Copper Tubinig Renee Fromme Awarded
12/20/2017 17-156 680 Plan - Highwawy 42 Water Main Installation Terri Conner Awarded
12/20/2017 17-152 Steel Casing Pipe Robin Heitz Awarded
12/20/2017 17-150 Transmission System Repairs and/or Capital Improvements Robin Heitz Awarded
12/13/2017 17-71 Construction Inspection Services Terri Conner Awarded
12/6/2017 17-155 PVC Pipe Renee Fromme Awarded
12/6/2017 17-154 Ductile Iron Water Main Pipe Renee Fromme Awarded
11/29/2017 17-149 RBF Pump Modifications at B.E. Paye Water Treatment Plant Robin Heitz Awarded
11/29/2017 17-140 Crew Truck with Crane Renee Fromme Awarded
11/29/2017 17-115 Potable Water Tank Miscellaneous Modifications & Repairs Renee Fromme Awarded
11/29/2017 17-78 Crescent Hill WTP Standby Generator Project Renee Fromme Awarded
11/22/2017 17-145 Propylene Glycol Robin Heitz Awarded
11/8/2017 17-138 Constantine PRV Replacement Terri Conner Awarded
11/8/2017 17-139 Wolf Pen Woods PRV Robin Heitz Awarded
10/18/2017 17-130 John L. Huber Building Standby Generator Robin Heitz Awarded
10/18/2017 17-129 Fire Hydrants Terri Conner Awarded
10/11/2017 17-122 Barricade Rental, Worksite Security, and Safety Sign Purchase Robin Heitz Awarded
10/11/2017 17-131 Bethany Valve Bart Potts Awarded
9/27/2017 17-120 Bank Stabilization at Collector Well #5 Terri Conner Awarded
9/27/2017 17-119 N. Buckeye Lane Main Extension and Little Goose Creek Crossing at Barbour Lane Terri Conner Awarded
9/27/2017 17-116 Oak Hill Booster Pump Station Robin Heitz Awarded
9/27/2017 17-108 Sale of Scrap Metal Robin Heitz Awarded
9/20/2017 17-117 Peaceful Valley Tank Rehabilitation Renee Fromme Under Review
9/20/2017 17-111 Cement Silo Replacement Renee Fromme Awarded
9/13/2017 17-104 Halls Hill Water Main Extension Renee Fromme Awarded
9/13/2017 17-102 I-64 Transmission Main Terri Conner Awarded
9/6/2017 17-113 Polywrap Robin Heitz Awarded
9/6/2017 17-100 Advanced Metering Infrastructure (AMI) Installation and Implementation Terri Conner Under Review
9/6/2017 17-92 North Shelby II Master Meter Robin Heitz Awarded
8/23/2017 17-109 Thierman Lane Water Main Transmission Project Robin Heitz Awarded
8/23/2017 17-105 Bardstown Elevated Water Storage Tank Terri Conner Awarded
8/23/2017 17-103 Insulated Concrete Forms Renee Fromme Awarded
8/16/2017 17-101 Switchgear Testing/Inspection/Cleaning/Repairs Renee Fromme Awarded
8/2/2017 17-97 Little Goose Creek Crossing Water Main Replacement Renee Fromme All Bids Rejected
7/26/2017 17-99 Water Treatment Chemicals Renee Fromme Awarded
7/19/2017 17-96 Bethany Booster Pumping Station Terri Conner Awarded
7/19/2017 17-74 Roy Wilkins Avenue Area LSR Robin Heitz Awarded
7/12/2017 17-94 N. 25th Street Area LSR Renee Fromme Awarded
6/28/2017 17-93 Bluegrass Avenue Area Lead Service Renewals Robin Heitz Awarded
6/21/2017 17-90 Eastern Parkway Area Water Main Replacement Project Terri Conner Awarded
6/21/2017 17-89 Copper Tubing Renee Fromme Awarded
6/21/2017 17-77 Potable Water Tank Cleaning & Inspection Services Renee Fromme Awarded
6/21/2017 17-88 Atwood Street Area Lead Service Renewals Robin Heitz Awarded
6/21/2017 17-87 Oxford Place Lead Service Renewals Renee Fromme Awarded
6/7/2017 17-82 Barricades, Cones & Lights Purchase Robin Heitz Awarded
5/24/2017 17-75 H2infO Intranet Upgrade and Improvements Robin Heitz Awarded
5/3/2017 17-73 Rose Island/Rose Wycombe Water Main Installation Project Terri Conner Awarded
5/3/2017 17-67 Prospect I (680 PZ) & Prospect II (770 PZ) Renee Fromme Awarded
4/26/2017 17-66 CH Masonry Improvements for Chemical/Lab/Main Office Buildings Renee Fromme Awarded
4/19/2017 17-44 Rose Island Pressure Reducing Valve Station Renee Fromme Awarded
4/19/2017 17-65 Plastic Meter VAults & Extension Rings Robin Heitz Awarded
4/19/2017 17-63 Brooks Hill Elevated Water Storage Tank Robin Heitz Awarded
4/19/2017 17-48 Tenny Avenue Area Water Main Replacement Project Terri Conner Awarded
4/19/2017 17-39 Nichols Drive Area Main Replacement Robin Heitz Awarded
4/12/2017 17-14 Ductile Iron Fittings & Accesories Renee Fromme Awarded
4/12/2017 17-60 Zorn Pump Station #3 Restoration Renee Fromme Awarded
4/12/2017 17-33 West Shelby Master Meter Robin Heitz Awarded
4/5/2017 17-07 Bardstown Road Area Lead Service Renewals Terri Conner Awarded
4/5/2017 17-61 Contingency Contract for Motor Repairs Robin Heitz Awarded
4/5/2017 17-12 Security Services for 3rd Street Renee Fromme Awarded
03/29/2017 17-13 Engineer of Record Renee Fromme Awarded
03/29/2017 17-57 Speed Avenue Area Lead Service Renewals Robin Heitz Awarded
03/29/2017 17-62 Cement Robin Heitz Awarded
3/22/2017 17-55 Winston Avenue Area LSR Renee Fromme Awarded
3/22/2017 17-49 Bradbe Road Water Main Relocation Robin Heitz Awarded
3/08/2017 17-40 Lexington Road Area main Replacement Renee Fromme Awarded
3/08/2017 17-38 New Lagrange Road area Main Replacement Renee Fromme Awarded
3/01/2017 17-02 Replace Intercom System Renee Fromme Awarded
3/01/2017 17-35 Hwy 1793 Water Main Installation Renee Fromme Awarded
3/01/2017 17-32 Sludge Hauling - Ft. Knox Renee Fromme Awarded
3/01/2017 17-43 Magazine Street area LSR Renee Fromme Awarded
2/22/2017 17-01 Notification and Collections of Delinquent Accounts Robin Heitz All Bids Rejected
2/22/2017 17-06 Hudson Lane Water Main Replacement Robin Heitz Awarded
2/22/2017 17-37 Lantana Drive Area Main Replacement Robin Heitz Awarded
2/15/2017 17-05 River Park Drive Area Lead Service Renewals Robin Heitz Awarded
2/15/2017 17-10 Right Hand Drive Utility Vehicles (Two and Four Door Models) Robin Heitz Awarded
2/8/2017 16-175 Ready Mix Concrete Robin Heitz Awarded
2/8/2017 17-09 Goshen Temporary Booster Pump Sstation Renee Fromme Awarded
1/25/2017 16-179 Kosmosdale Tank Coatings Renovation Robin Heitz Awarded
1/18/2017 16-169 Portland Basin Water Main Extension Renee Fromme Awarded
1/18/2017 17-04 Copper Tubing Renee Fromme Awarded
1/4/207 16-177 Steel Casing Piping Robin Heitz Awarded
1/4/2017 16-178 Polywrap Robin Heitz Awarded
12/21/2016 16-174 Brooks Hill Water Tower Demo & Build Renee Fromme Reject All Bids
12/14/2016 16-22 Major Engine & Transmission Repairs - Under One Ton Robin Heitz Awarded
12/14/2016 16-23 Major Engine & Transmission Repairs - One Ton & Over Robin Heitz Awarded
12/14/2016 16-173 48" Bell Joint Clamps Robin Heitz Awarded
12/14/2016 16-170 Soil, Stone, Mfgd Sand, and Concrete Sand Renee Fromme Awarded
11/30/2016 16-165 PVC Pipe Renee Fromme Awarded
11/30/2016 16-164 Ductile Iron Pipe Renee Fromme Awarded
11/30/2016 16-144 Southside Drive Area Water Main Replacement Project Terri Conner Awarded
11/9/2016 16-162 Hydraulic, Machine & Gear Oils Terri Conner Awarded
11/09/2016 16-155 Pipeline and Ferrous Metal Detector Robin Heitz Awarded
11/09/2016 16-160 48" & 60" Horizontal Gate Valves Renee Fromme Awarded
11/02/2016 16-154 Plate Trucks Terri Conner Awarded
11/02/2016 16-159 Water Treatment Chemicals- Liquidd Carbon Dioxide Renee Fromme Awarded
11/02/2016 16-145 Fort Knox Lagoon #4 - Residual Removal Renee Fromme Awarded
10/19/2016 16-152 Vehicle Wash Supplies Robin Heitz Awarded
10/19/2016 16-153 Manhole Frames & Covers Robin Heitz Awarded
10/5/2016 16-146 Mt. Washington Highway 44 Master Meter Terri Conner Awarded
10/5/2016 16-119 Ft. Knox - Water Treatment Chemicals Renee Fromme Awarded
9/28/2016 16-142 Frankfort Avenue Area Lead Service Renewals Robin Heitz Awarded
9/28/2016 16-141 Valve and Meter Box Maintenance Renee Fromme Awarded
9/28/2016 16-147 Fencing for Clear Run Road Property Renee Fromme Awarded
9/21/2016 16-126 Contingency Contract for Pump Repairs Robin Heitz Awarded
9/14/2016 16-122 Cisco Maintenance Contract Renewals Terri Conner Awarded
9/14/2016 16-54 Belmont Road Grid Tie Terri Conner Awarded
9/14/2016 16-01 Roof Consulting Services Renee Fromme Awarded
9/14/2016 16-132 Coffee Services Robin Heitz Awarded
8/31/2016 16-03 Transmission Pipeline System Design Engineering Services Terri Conner Awarded
8/24/2016 16-20 Old Henry Road Water Main Grid-Tie Project Robin Heitz Awarded
8/17/2016 16-124 Minor Lane 30-Inch Grid Tie and N. English Station Road 36-Inch Grid Tie Terri Conner Awarded
8/17/2016 16-131 Concrete Paved Services Terri Conner Awarded
08/17/2016 16-125 Allmond Truck Wash Roof Replacement & Masonry Improvements Robin Heitz Awarded
08/10/2016 16-21 CIS Analytics Renee Fromme Awarded
08/03/2016 16-128 ARC Flash Personal Protection Equipment Renee Fromme Awarded
08/03/2016 16-118 Water Treatment Chemicals Renee Fromme Awarded
07/27/2016 16-127 Propylene Glycol Robin Heitz Awarded
07/20/2016 16-91 Switchgear Rehabilitation at Crescent Hill & Zorn Pump Station Renee Fromme Awarded
07/20/2016 16-116 Copper Tubing Renee Fromme Awarded
07/20/2016 16-113 Repair Couplings & Gaskets Renee Fromme Awarded
07/20/2016 16-112 Rebar Anchors Renee Fromme Awarded
07/20/2016 16-111 Casing Spacers Renee Fromme Awarded
7/13/2016 16-120 Eastern Parkway 48-Inch Transmission Main Rehabilitation Phase I Terri Conner Awarded
7/13/2016 16-106 Davids Drive Grid-Tie Robin Heitz Awarded
7/13/2016 16-110 Pipe Repair Sleeves Renee Fromme Awarded
7/13/2016 16-109 Meter Setters Renee Fromme Awarded
7/6/2016 16-15 Swing Check Valves Terri Conner Awarded
6/22/2016 16-108 Algonquin Parkway and Story Avenue MRRP Robin Heitz Awarded
6/22/2016 16-84 RFP - Oracle Work and Asset Management (WAM) Solution Implementation Services Renee Fromme Under Review
6/15/2016 16-83 M/WBE Availability Study Renee Fromme Awarded
6/15/2016 16-105 Westport Road Tank and Oak Hill Tank Coatings Renovation Terri Conner Awarded
06/08/2016 16-102 Steel Casing Piping David Collier Awarded
06/08/2016 16-95 5000# Lift Capacity, LP Gas Powered Forklifts Brian Matherly Awarded
06/01/2016 16-96 BEPWTP RBF Building Roof Replacement & Masonry Improvements Renee Fromme Awarded
06/01/2016 16-83 MWBE Availability Study Renee Fromme Awarded
5/25/2016 16-103 Aluminum Hatches Terri Conner Awarded
5/25/2016 16-97 Preston Highway Water Main Replacements Robin Heitz Awarded
5/18/2016 16-94 Kenwood Area Cured in Place Pipe Project Renee Fromme All Bids Rejected
5/4/2016 16-81 Cooper Chapel 16" Water Main Installation Robin Heitz Awarded
5/4/2016 16-60 Bells Lane Water Main Replacement Robin Heitz Awarded
4/27/2016 16-82 MJ Restraint Joint Adapters Renee Fromme Awarded
4/27/2016 16-80 Windsor Forest-Parkridge Grid Tie Renee Fromme Awarded
4/27/2016 16-11 Flat Faced Spool Flanges Robin Heitz Awarded
4/13/2016 16-77 Goldsmith Lane Area MRRP Renee Fromme Awarded
4/6/2016 16-48 Skid Mounted Air Compressors Terri Conner Awarded
4/6/2016 16-76 Portland Avenue Area MRRP Robin Heitz Awarded
4/6/2016 16-59 Graston Avenue Area Water Main Replacement Robin Heitz Awarded
3/30/2016 16-05 Caterer in Residence / Event Management Services for LWTP Renee Fromme Awarded
3/9/2016 16-52 Third Street Area Lead Service Renewals Project Robin Heitz Awarded
3/2/2016 16-50 Oak Street Area MRRP Renee Fromme Awarded
3/2/2016 16-47 Rowan Street Area Lead Service Renewals Terri Conner Awarded
2/24/2016 16-46 South Brook Street Area Lead Service Renewals Robin Heitz Awarded
2/17/2016 16-41 Muhammad Ali Area MRRP Renee Fromme Awarded
2/17/2016 16-40 West Main Street Area Lead Service Renewals Robin Heitz Awarded
2/12/2016 16-35 Lebanon Junction Master Meter 4 ( 20" Transmission Main to HCWD #2) Terri Conner Awarded
2/3/2016 16-37 Polywrap David Collier Under Review
2/3/2016 16-10 Restraint Joint Clamps David Collier Under Review
1/27/2016 16-06 Lexington Road Bridge Main Replacement Renee Fromme Awarded
01/20/2016 16-07 Grid-Tie Raymond Road, Wilderness Trail to HWY 44 Robin Heitz Awarded
12/30/2015 15-170 Zorn Pump Station - Install Screen #1 Foot Shaft Assembly Terri Conner Awarded
12/23/2015 15-143 Horizontal Directional Drilling Renee Fromme Awarded
12/16/2015 15-168 Stone, Soil, Mfg. Sand Coarse Concrete Sand Renee Fromme Awarded
12/16/2015 15-153 Allmond Avenue Inspector's Office Improvements Robin Heitz Awarded
12/9/2015 15-167 PVC Pipe David Collier Under Review
12/9/2015 15-166 Ductile Iron Pipe David Collier Under Review
12/9/2015 15-125 Lime System Improvements at Crescent Hill Water Treatment Plant Terri Conner Awarded
11/18/2015 15-100 Hydraulic, Machine & Gear Oils Terri Conner Awarded
11/4/2015 15-139 Corporate Wellness Program Renee Fromme Awarded
11/4/2015 15-145 Copper Tubing David Collier Under Review
11/4/2015 15-146 Steel Casing Pipe David Collier Under Review
10/28/2015 15-126 Cedar Grove Tank Modifications Robin Heitz Awarded
10/28/2015 15-137 CHWTP Fluoride Bldg - Roof Replacement and Masonry Improvements Renee Fromme Awarded
10/21/2015 15-124 Transmission-Mellwood Avenue 30" Clean & Cement Lining Project Terri Conner Awarded
9/30/2015 15-116 Water Treatment Chemicals - Ft. Knox Renee Fromme Awarded
9/30/2015 15-127 Frames and Covers and Riser Rings David Collier Under Review
9/23/2015 15-123 CHGM & CHPS Office Lighting Replacement Renee Fromme Awarded
8/26/2015 15-113 Compostable Cups, 8 oz. and 12 oz. Robin Heitz Awarded
8/26/2015 15-115 Allmond Avenue Pavements Improvements for Material yard Storate Robin Heitz Awarded
8/19/2015 15-82 Brass Valves and Fittings David Collier Under Review
8/19/2015 15-38 Water Bottles, 16 oz. and 22 oz. Robin Heitz Awarded
8/19/2015 15-81 Tapping Sadles David Collier Under Review
08/12/2015 15-45 IT Consulting Servicews Obe Everett Awarded
8/12/2015 15-111 24-Inch PCCP Replacement After Condition Assessment Terri Conner Awarded
8/5/2015 15-110 Water Treatment Chemicals Renee Fromme Awarded
7/22/2015 15-99 Crew Truck Cab & Chassis Robin Heitz Awarded
7/15/2015 15-80 Propylene Glycol David Collier Under Review
7/15/2015 15-79 Barricades, Lights and Traffic Cones David Collier Under Review
7/8/2015 15-98 680 Plan Highway 42 16" Transmission Main (Prospect PRV Station to greenmere Blvd) Renee Fromme Under Review
7/8/2015 14-168 Laser Printer Maintenance, Service and Supplies Robin Heitz Awarded
7/8/2015 15-97 15 Ton Trailers Terri Conner Awarded
7/01/2015 15-93 I-64 West Area Lead Service REnewals Renee Fromme Under Review
6/24/2015 15-90 Heavy Equipment Rental Renee Fromme Under Review
6/24/2015 15-87 Fleet Brake Services Terri Conner Under Review
6/17/2015 15-37 Towing Services Robin Heitz Awarded
6/10/2015 15-85 Standard Country Club Tank Coatings Robin Heitz Awarded
5/13/2015 15-07 Plastic Meter Vaults and Elevator Rings David Collier Under Review
5/6/2015 15-59 Forest Hill Hydro-Booster Pumping Station Renovation Renee Fromme Under Review
5/6/2015 15-18 Poplar Level Road Area Water Main Replacement Robin Heitz Awarded
5/6/2015 15-25 Eastern Parkway Area Lead Service Renewals Terri Conner Awarded
4/29/2015 15-53 Copper Tubing David Collier Under Review
4/29/2015 15-52 Polywrap David Collier Under Review
4/29/2015 15-51 Steel Casing Pipe David Collier Under Review
4/29/2015 15-55 860 PZ - English Station 3MG Elevated Water Storage Tank Robin Heitz Awarded
4/15/2015 15-16 Hale Avenue MRRP Renee Fromme Awarded
4/15/2015 15-19 I-65 Area Lead Service Renewal Project Terri Conner Awarded
4/8/2015 15-12 Haldeman Avenue Water Main Replacement Robin Heitz Awarded
4/8/2015 15-24 Cherokee Road Area Lead Service Renewals Terri Conner Awarded
4/8/2015 15-48 Timber Ridge & Country Lane Grid Tie Renee Fromme Awarded
4/1/2015 15-15 7th Street Area Water Main Replacement Robin Heitz Awarded
4/1/2015 15-44 Middletown Tank Demolition Terri Conner Awarded
4/1/2015 15-05 Worksite Security David Collier Under Review
3/25/2015 15-17 Middletown Area MRRP Carol Lyons Awarded
3/25/2015 15-06 Water Pressure Regulators David Collier Under Review
3/18/2015 15-32 Grounds Maintenance and Snow Removal for LWC Terri Conner Awarded
4/08/2015 15-13 Harrods Creek Area Main Replacement Renee Fromme Bid Cancelled
3/18/2015 15-31 Beech Grove Robin Heitz Awarded
3/18/2015 15-34 Lake Forest Parkway 16" Water Main Installation Project Robin Heitz Awarded
3/11/2015 15-28 Hurstbourne Point Grid Tie Renee Fromme Bids Rejected
3/4/2015 15-27 Cherry Grove Grid-Tie Renee Fromme

Awarded

3/4/2015 15-22 Barbee Way Area Lead Service Renewals Robin Heitz Awarded
3/4/2015 15-33 680 Plan - Old Highway 1793 8 Inch Water Main Installation Project Terri Conner Awarded
3/4/2015 15-10 Outer Loop Area Water Main Replacement Project Terri Conner Awarded
2/25/2015 15-11 Manslick Road Area Water Main Replacements Renee Fromme Awarded
2/25/2015 15-23 Fischer Avenue Area Lead Service Renewals Terri Conner Awarded
2/11/2015 15-21 1st Street Area Lead Service Renewals Renee Fromme Awarded
2/11/2015 15-29 Site Restoration Terri Conner Awarded
2/11/2015 15-09 Broadway Area Water Main Replacement Project Terri Conner Awarded
2/11/2015 15-14 East End Area MRRP Robin Heitz Awarded
1/07/2015 14-144 Steel Casing, Boring & Jacking Renee Fromme Awarded
1/07/2015 14-207 Clermont Road 1.0 MG Elevated Water Storage Renee Fromme Awarded
12/31/2014 14-198 Mt. Washington Master Meter Robin Heitz Awarded
12/17/2014 14-101 Valve & Meter Box Maintenance Robin Heitz Under Review
12/17/2014 14-200 Chapeze Lane, Preston Highway, Cedar Grove Road & Clermont Road Transmission Main Installation Terri Conner Awarded
12/03/2014 14-177 Ductile Iron Pipe Dave Collier Under Review
12/03/2014 14-176 PVC Pipe Dave Collier Under Review
12/03/2014 14-196 Excavator and Skid Steer Replacement Tracks Renee Fromme Awarded
10/08/2014 14-180 Chapeze Booster Pumping Station Carol Lyons Under Review
11/26/2014 14-174 Vacuum Excavating Services Renee Fromme Awarded
11/05/2014 14-181 Smyrna Parkway Water Main Replacement Project Renee Fromme Awarded
11/5/14 14-182 Orange Drive Water Main Replacement Project Robin Heitz Awarded
10/29/2014 14-130 Tapping Sleeves with MJ Outlets David Collier Under Review
10/29/2014 14-170 PAC Slurry Mixing and Storage Equipment Renee Fromme

Awarded

10/22/2014 14-172 Rehab - 60-inch RCP - Bluegrass, Hazelwood, and Manslick Robin Heitz Under Review
10/22/2014 14-171 Portable PAC Storage and Feed System Renee Fromme Awarded
10/22/2014 14-159 770 Pressure Zone - Bullitt County Robin Heitz Under Review
10/8/2014 14-166 Prospect Tank Demolition Terri Conner Awarded
10/8/2014 14-164 Concrete Paved Surfaces Terri Conner Awarded
10/1/2014 14-162 Minor Lane BPS Sodium Chlorite Feed System Terri Conner Awarded
10/1/2014 14-167 Copper Tubing David Collier Under Review
9/24/2014 14-189 Paving Restoration (Joint Bid w/ MSD Bid#14-0924) Terri Conner Awarded
9/24/2014 14-163 34th Street Area Water Main REplacement Project Renee Fromme Awarded
9/17/2014 14-160 Cisco Network Equipment Robin Heitz Awarded
9/17/2014 14-123 20-Inch Transmission Main to Hardin County Water District #2 Robin Heitz Under Review
9/3/2014 14-141 690 Plan - Cedar Grove - South Booster Pumping Station Terri Conner Awarded
9/03/2014 14-136 Dreams End Drive Water Main Extension Renee Fromme Awarded
8/27/2014 14-133 Tank Coating Program - Blankenbaker Crossings and Jefferson Memorial Tanks Terri Conner Awarded
8/27/2014 14-59 B.E. Payne Lagoon No. 3 - Residual Removal Renee Fromme Awarded
8/27/14 14-134 B.E. Payne Water Treatment Plant Mixer Renovation Robin Heitz Awarded
8/20/2014 14-142 Cisco Maintenance Contract Renewals Terri Conner Awarded
8/20/2014 14-137 Steel Casing Pipe David Collier Under Review
8/20/2014 14-100 Pipe Repair Couplings David Collier Under Review
8/13/2014 14-138 Water Treatment Chemicals -Ft. Knox Renee Fromme Awarded
8/13/2014 14-131 Crescent Hill Pump Station Slate Roof Replacement and Masonry Improvements Renee Fromme Reject All Bids
8/13/2014 14-128 Allmond Distribution Center Garage Overhead Crane Replacement Robin Heitz Awarded
8/13/2014 14-98 Casing Spacers David Collier Under Review
8/13/2014 14-99 Rebar Anchors David Collier Under Review
8/13/2014 14-129 Propylene Glycol David Collier Under Review
8/6/2014 14-117 Water Treatment Chemicals Renee Fromme Awarded
8/6/2014 14-126 Salt River Booster Pumping Station - 690 Plan Robin Heitz Awarded
8/6/2014 14-97 Pipe Repair Sleeves David Collier Under Review
8/6/2014 14-96 Meter Setters David Collier Under Review
8/6/2014 14-102 Polywrap David Collier Under Review
7/30/2014 14-87 Watterson Expressway Area Lead Service Renewals Terri Conner Reject All Bids
7/30/2014 14-127 Louisville Water Company Pumping Station - 690 Plan Terri Conner Awarded
7/23/2014 14-124 Hydraulic, Machine and Gear Oils Terri Conner Awarded
7/16/2014 14-119 New Services Renee Fromme Awarded
7/9/2014 14-114 Bullitt County Extension Program Worldview Circle Area Main Extension Renee Fromme Awarded
7/9/2014 14-118 Reutlinger Avenue Area Lead Service Renewals Terri Conner Awarded
7/9/2014 14-111 Filter Drain Valve Replacement @ BEPWTP - Phase 3 Robin Heitz Awarded
6/25/2014 14-113 Edgeland Avenue Area Lead Service Renewals Renee Fromme Awarded
6/25/2014 14-121 Dreams End Drive Main Extension Robin Heitz Reject All Bids
6/2/2014 14-112 Rosewood Avenue Area Lead Service Renewals Robin Heitz Awarded
6/25/2014 14-86 Central Area - Northeast Area Lead Service Renewals Terri Conner Awarded
6/18/2014 14-90 Grinstead Drive Area Water Main Replacement Project Robin Heitz Awarded
6/4/2014 14-85 Wirth Avenue Area Lead Service Renewals Terri Conner Awarded
5/28/2014 14-34 B.E. Payne WTP & Crescent Hill WTP Liquid Ammonia Feed System Renee Fromme Awarded
5/28/2014 14-02 Customer Identification Verification Services Robin Heitz Under Review
5/21/2014 14-79 Berry Boulevard Area Lead Service Renewals Project Robin Heitz Awarded
5/21/2014 14-01 Crescent Hill Filter Plant / 480 Volt Distribution system Rehabilitation Renee Fromme Awarded
5/14/2014 14-82 Vehicle Wash Supplies Robin Heitz Awarded
5/14/2014 14-75 Cisco UCS Blade Servers Robin Heitz Awarded
5/7/2014 14-77 10th Street Area MRRP Renee Fromme Awarded
5/7/2014 14-31 Swing Check Valves David Collier Under Review
4/30/2014 14-47 B.E. Payne Process Water and Storm Water Drainage Control and Sanitary Sewers Renee Fromme Awarded
4/30/2014 14-60 22nd Street Area Water Main Replacement Project Terri Conner Awarded
4/30/2014 14-44 Plumbing Services Robin Heitz Awarded
4/16/2014 14-46 Brooks Hill Booster Pump Station Renee Fromme Awarded
4/16/2014 14-56 Crew Truck Underdeck Air Compressor/AC Generator Renee Fromme Awarded
4/16/2014 14-54 Crescent Hill Treatment Plant - Security Building and Grinstead Entrance Improvements Robin Heitz Under Review
4/2/2014 14-30 AVT Insertion Valves David Collier Under Review
4/2/2014 14-28 Valve Boxes David Collier Under Review
4/2/2014 14-25 Distribution System Repairs and Capital Improvements Terri Conner Awarded
4/2/2014 14-41 770 Plan - Springdale Road PRV Station Terri Conner Awarded
3/26/2014 14-43 Water Bottles, 14 oz. and 22 oz. Robin Heitz Awarded
3/26/2014 14-45 REHAB - 24-Inch PCCP Cross County Header Robin Heitz Awarded
3/12/2014 14-42 Copper Tubing David Collier Under Review
3/5/2014 14-23 PVC Pipe David Collier Under Review
3/5/2014 14-26 Ductile Iron Pipe David Collier Under Review
3/5/2014 14-24 Temporary Booster Pumps Terri Conner No Bids
3/5/2014 14-18 Long Run Tank Demolition Terri Conner Awarded
02/12/2014 14-19 Long Run Tank Power and Telemetry Panel Relocation Renee Fromme Awarded
02/12/2014 13-197 Colliers Way & Mt. Elmira Rd. Grid Tie & PRV Robin Heitz Awarded
02/05/2014 14-08 Major Engine Transmission Repairs - One Ton and Over Robin Heitz Awarded
02/05/2014 14-07 Major Engine Transmission Repairs - Under One Ton Robin Heitz Awarded
01/08/2014 13-151 Sale of LWC Surplus Property Carol Lyons Under Review
12/18/2013 13-101 Print Utility & Mail Services Renee Fromme Final-Corrected
12/11/2013 13-115 Restraint Joint Adapters David Collier Under Review
12/11/2013 13-116 Gate Wheel Valves David Collier Under Review
12/11/2013 13-117 Ductile Iron Pipe Restraint Joint Pipe David Collier Under Review
12/11/2013 13-118 PVC Pipe David Collier Under Review
12/11/2013 13-181 Ball Park Tank Demolition Terri Conner Awarded
12/4/2013 13-114 Stone, Soil, Mfg Sand & Coarse Concrete Sand David Collier Under Review
12/4/2013 13-113 Ready Mix Concrete and Flowable Fill David Collier Under Review
11/27/2013 13-148 Equipment Rental - Louisville Water Tower Renee Fromme Awarded
11/20/2013 13-180 Communication System Maintenance Renee Fromme Awarded
11/6/2013 13-175 Steel Casing Pipe David Collier Under Review
11/6/2013 13-119 Polywrap David Collier Under Review
10/23/2013 13-155 Analytical Services For Drinking Water Terri Conner Awarded
10/23/2013 13-170 Bullitt County Extension Program - Nichols Hill Road Booster Pumping Station Terri Conner Awarded
10/16/2013 13-165 Ball Park Tank Demolition Robin Heitz Reject All Bids
10/16/2013 13-168 PVC Pipe David Collier Under Review
10/16/2013 13-150 REHAB - 60-inc RCP-Bluegrass, Hazelwood, and Manslick Renee Fromme Reject All Bids
10/9/2013 13-145 HVAC Maintenance Renee Fromme Awarded
10/9/2013 13-162 48" Bell Joint Clamps David Colier Under Review
10/9/2013 13-163 Fifteen (15) Ton Trailer Robin Heitz Awarded
10/2/2013 13-164 Utility Service Body for 1 Ton Cab & Chassis Terri Conner Awarded
10/2/2013 13-160 Ten (10) Yard Dump Body Robin Heitz Awarded
9/25/2013 13-149 Water Treatment Chemicals for Fort Knox Facility Renee Fromme Under Review
9/25/2013 13-156 Contingency Contract for Motor Repairs Robin Heitz Awarded
9/25/2013 13-154 Vehicle Body and Suspension Repairs - Heavy Duty Robin Heitz Awarded
9/25/2013 13-153 Vehicle Body and Suspension Repairs - Light Duty Robin Heitz Awarded
9/25/2013 13-143 Road and Tire Service Robin Heitz Awarded
9/18/2013 13-142 Filter Drain Valve Replacement at B.E. Payne Water Treatment Plant Phase 2 Terri Conner Awarded
9/4/2013 13-138 Networking Upgrades and Replacements Robin Heitz Awarded
9/4/2013 13-141 Crescent Hill Water Treatment Plant Frankfort Avenue Wall Restoration Renee Fromme Awarded
8/28/2013 13-89 Freys Hill Booster Pumping Station Renovation Renee Fromme Awarded
8/14/2013 13-107 Crescent Hill Filter Plant Control Room Modifications Robin Heitz Awarded
8/14/2013 13-135 Ductile Iron Pipe Restraint Joint Pipe David Collier Under Review
8/14/2013 13-134 Bullitt County Water Improvement Program Walls Hollow Road North Grid Tie Terri Conner Awarded
8/7/2013 13-112 Brass Valves and Fittings David Collier Under Review
8/7/2013 13-94 Hydraulic, Machine and Gear Oils Terri Conner Awarded
7/24/2013 13-03 Employee Assistance Program Services Carol Lyons Awarded
7/24/2013 13-106 Water Treatment Chemicals Carol Lyons Awarded
7/17/2013 13-104 Crescent Hill Gate House and Gatekeepers House Improvements Carol Lyons Awarded
7/17/2013 13-99 Tank Coating Program 2013-Blankenbaker Crossings and Jefferson Memorial Tanks Terri Conner Reject All Bids
7/10/2013 13-98 Bullitt County Extension Program North and South Summitt Drive Booster Pumping Station Terri Conner Awarded
7/10/2013 13-95 770 PZ Bayberry PRV Station Rebuild Robin Heitz Awarded
7/3/2013 13-100 Bullitt County Water Improvement Program Horse Run Court and Hill Creek Road Grid-Tie Terri Conner Awarded
6/26/2013 13-93 Gap-in-Knob Standpipe Demolition Terri Conner Reject All Bids
6/19/2013 13-92 Chilicoop Standpipe Demolition Robin Heitz Awarded
6/19/2013 13-87 I-65 Area Water Main Replacement Project Robin Heitz Awarded
6/12/2013 13-90 Lime Kiln Lane Water Main Replacement Project Robin Heitz Awarded
6/12/2013 13-91 Bullitt County Water Improvement Program Two-Thirds Majority Petition: Nichols Hill Road & Ables Mountain Lane Robin Heitz Awarded
6/5/2013 13-88 Lexington Road Area Lead Service Renewal Terri Conner Awarded
6/5/2013 13-86 Adams Hill Townhomes Water Main Replacement Robin Heitz Reject All Bids
6/5/2013 13-82 NACE 3 Consultants Terri Conner Awarded
6/5/2013 13-81 2013 Cathodic Protection Installation Project Terri Conner Awarded
6/5/2013 13-45 Janitorial Services Carol Lyons Awarded
6/5/2013 13-24 B.E. Payne WTP Sodium Hypochlorite Generation Facilities Carol Lyons Awarded
5/29/2013 13-85 Heavy Equipment Rental Carol Lyons Awarded
5/22/2013 13-58 Copper Tubing David Collier Under Review
5/15/2013 13-78 Bullitt County Water Improvement Program 2/3's Majority Petition North and South Summit Drive 4-Inch Water Main Extension Terri Conner Awarded
5/15/2013 13-74 Navteq Data Terri Conner Awarded
5/15/2013 13-70 Lower Hunters Trace Water Main Replacement Project Terri Conner Awarded
5/8/2013 13-75 Cisco UCS Server Robin Heitz Awarded
5/8/2013 13-72 Sherwood Avenue Area Lead Service Renewals Robin Heitz Under Review
5/1/2013 13-64 Sodium Permanganate Feed System and Lime Dust Collection System at CHWTP Carol Lyons Awarded
5/1/2013 13-17 Plastic Meter Vaults and Elevator Rings David Collier Under Review
5/1/2013 13-68 Water Pressure Regulators David Collier Under Review
5/1/2013 13-57 44th Street Area Water Main Replacement Project Terri Conner Awarded
4/24/2013 13-66 Inspection, Maintenance & Repair of Elevators at Louisville Water Company Terri Conner Awarded
4/24/2013 13-63 Oracle Workspace Optimization - John L. Huber Building Terri Conner Awarded
4/24/2013 13-61 Small Hand Tools David Collier Awarded
4/10/2013 13-18 Ductile Iron Fitting and Accessories David Collier Awarded
4/10/2013 13-23 Breckenridge Lane Water Main Grid-Tie Project Robin Heitz Awarded
4/10/2013 13-19 Aluminum Hatches David Collier Awarded
4/3/2013 13-15 Transmission System Repairs and/or Capital Improvements Carol Lyons Awarded
4/3/2013 13-56 Cement David Collier Under Review
4/3/2013 13-50 Bardstown Road Main Replacement Robin Heitz Awarded
4/3/2013 13-54 2013 Shoring Box Purchase Terri Conner Awarded
4/3/2013 13-47 B.E. Payne Water Treatment Plant High Lift Building Area Improvements 12-Inch Yard Piping Terri Conner Awarded
3/20/2013 13-44 Powdered Activated Carbon for Ft. Knox Carol Lyons Awarded
3/20/2013 13-32 LWC Grid-Ties (Blankenbaker Pkwy & Woodfern Lane to Labor Way) Robin Heitz Awarded
3/13/2013 13-30 Uniforms for Union Staff Robin Heitz Awarded
3/13/2013 13-26 Ormsby Lane Water Main Replacement Project Terri Conner Awarded
3/6/2013 13-25 St. Anthony Woods Court and Easement 1932 Water Main Replacement Project Terri Conner Awarded
3/6/2013 13-09 Aiken Road Main Replacement Project Terri Conner Awarded
2/27/2013 13-11 Rolling Fields Water Main Replacement Project Terri Conner Awarded
2/20/2013 12-118 External Post-Tensioning Tendon Reapirs on Large Diameter PCCP Water Mains Carol Lyons Awarded
2/13/2013 13-12 16" & 20" Restraint Joint Clamps David Collier Awarded
2/13/2013 13-13 I-265 Bridge (East End) Water Main Relocation Project Terri Conner Awarded
1/30/2013 12-106 Carbon Fiber-Reinforced Polymer Repairs on Large diameter Water Mains Carol Lyons Awarded
1/23/2013 13-02 Maintenance, Repair and Supplies for Konica / Minolta Multifunction Machines Carol Lyons Awarded
1/9/2013 13-06 Tapping Sleeves with MJ Outlets David Collier Awarded
1/9/2013 12-99 PVC Pipe David Collier Awarded
1/9/2013 12-148 Ductile Iron Pipe David Collier Awarded
1/9/2013 12-145 Restraint Joint Clamps David Collier Awarded
1/9/2013 12-205 Water Fill Stations Upgrade Project Robin Heitz Under Review
12/12/2012 12-151 Brass Valves and Fittings David Collier Under Review
12/12/2012 12-181 Drain Valves for BEPWTP Filters (Phase 1) Robin Heitz Awarded
11/28/2012 12-178 Bottle Blow Moulding Machine Terri Conner Reject all bids
11/14/2012 12-139 Fire Hydrants David Collier Under Review
11/14/2012 12-190 Major Engine and Transmission Repairs - Under One Ton Robin Heitz Awarded
11/14/2012 12-191 Major Engine and Transmission Repairs - One Ton and Over Robin Heitz Awarded
11/14/2012 12-78 Louisville Water Company Pumping Station #1 Restoration Tax Credit Terri Conner Awarded
11/7/2012 12-192 BE Payne Water Treatment Plant High Lift Building Area Improvements Terri Conner Reject all bids
10/24/2012 12-146 Ready Mix Concrete & Flowable Fill David Collier Under Review
10/24/2012 12-147 Valve Meter Box Maintenance David Collier Under Review
10/24/2012 12-172 Bullitt County AMR Installation Project Carol Lyons Awarded
10/17/2012 12-179 Taylorsville Road - Chenoweth Run Road Project Terri Conner Awarded
10/10/2012 12-176 Restoration Construction of Asphalt and Concrete Paved Surfaces David Collier Under Review
10/10/2012 12-144 Barricade Rentals David Collier Under Review
10/3/2012 12-177 Water Treatment Chemicals for Ft. Knox Carol Lyons Awarded
9/26/2012 12-171 Zorn Pump Station #1 Interior Restoration Terri Conner Awarded
9/26/2012 12-175 Taylorsville Master Meter #1 Renovation Terri Conner Awarded
9/19/2012 12-156 Preston Highway 16" Transmission Main - Hwy 245 to Belmont Road Terri Conner Awarded
9/19/2012 12-112 Electrical Switchgear Cleaning... Carol Lyons Under Review
9/12/2012 12-158 CISCO Maintenance Carol Lyons Awarded
9/12/2012 12-143 Rebar Anchors David Collier Under Review
9/12/2012 12-142 Casing Spacers David Collier Under Review
9/12/2012 12-150 Pipe Repair Couplings David Collier Under Review
9/12/2012 12-152 Outer Loop and Melda Drive Main Replacement Project Terri Conner Awarded
9/12/2012 12-153 LaGrange Road Main Replacement Project Terri Conner Awarded
9/12/2012 12-115 Vehicle Body and Suspension Repair - Light Duty Robin Heitz Awarded
9/12/2012 12-114 Vehicle Body and Suspension Repair - Heavy Duty Robin Heitz Awarded
9/12/2012 12-113 Road and Tire Service Robin Heitz Awarded
9/12/2012 12-83 Wolf Pen Branch Phase II Transmission Main Carol Lyons Awarded
9/5/2012 12-108 North Buckman Street Main Replacement and Pressure Reducing Station Project Carol Lyons Awarded
9/5/2012 12-140 Pipe Repair Sleeves David Collier Under Review
9/5/2012 12-138 Meter Setters David Collier Under Review
9/5/2012 12-137 Sale of Scrap Metal David Collier Under Review
8/29/2012 12-134 JLH Building New Boiler Robin Heitz Awarded
8/29/2012 12-132 2012 Cathodic Protection Installation Project Terri Conner Awarded
8/29/2012 12-133 NACE 3 Consultant Terri Conner Awarded
8/22/2012 12-135 Meter Plug Locks David Collier Under Review
8/22/2012 12-130 Taylorsville Road Main Replacement Project Terri Conner Awarded
8/22/2012 12-117 John L Huber Building Emergency Operations Center Terri Conner Awarded
8/8/2012 12-116 Water Treatment Chemicals Carol Lyons Awarded
8/8/2012 12-98 Horizontal Directional Drilling Terry Atwell Awarded
7/18/2012 12-62 Swing Check Valves David Collier Under Review
7/18/2012 12-85 New Services Carol Lyons Awarded
7/11/2012 12-107 Shelbyville Road Main Replacement Project Terri Conner Awarded
7/11/2012 12-96
Corrected
Wireless Network Switch Replacements for Allmond Ave., and Crescent Hill Filter Plant (CHFP) Carol Lyons Awarded
7/11/2012 12-61 Barricades, Lights and Traffic Cones David Collier Under Review
7/11/2012 12-89 LWC Property Protection Services Carol Lyons Awarded
7/11/2012 12-104 Steel Casing Pipe David Collier Under Review
7/11/2012 12-102 Copper Tubing David Collier Under Review
6/27/2012 12-95 Millers Lane and Dixie Highway Water Main Replacement Project Terri Conner Awarded
6/20/2012 12-94 Rose Island Road Water Main Extension Project Terry Atwell Awarded
6/20/2012 12-88 Truck Service Body Terri Conner Awarded
6/20/2012 12-87 Utility Service Body for 1 Ton Cab & Chassis Terri Conner Awarded
6/6/2012 12-34 Vehicle Wash Supplies Carol Lyons Awarded
6/6/2012 12-33 Heavy Equipment Rental Carol Lyons Awarded
6/6/2012 12-86 Crew Truck 33,000 GVWR Cab Chassis and Tandem Dump Truck 52,000 GVWR Cab Chassis Carol Lyons Awarded
5/30/2012 12-80 Elevator and Structural Slab Rehabilitation for Crescent Hill Zorn Pump Station Boiler Buildings Terry Atwell Awarded
5/30/2012 12-84 West Blue Lick Road Water Main Replacement Carol Lyons Awarded
5/23/2012 12-82 Poplar Level Road and Hess Lane Water Main Replacement Project Terri Conner Awarded
5/16/2012 12-52 Hydraulic, Machine and Gear Oils Terri Conner Awarded
5/16/2012 12-79 Reamers Road Water Main Replacement Program Terri Conner Awarded
5/2/2012 12-57 Ductile Iron Pipe Fittings With Accessories David Collier Under Review
5/2/2012 12-73 Southside Drive and Iroquois Avenue Terry Atwell Under Review
5/2/2012 12-59 Aluminum Hatches David Collier Under Review
5/2/2012 12-58 Tapping Saddles David Collier Under Review
5/2/2012 12-54 Plastic Meter Vaults and Elevator Rings David Collier Under Review
4/25/2012 12-72 Philips Lane and Preston Highway Water Main Replacement Project Terri Conner Awarded
4/4/2012 12-47 De-chlorination Facilities at CHWTP & BEPWTP Carol Lyons Awarded
4/4/2012 12-68 Old Harrods Creek Road and Tucker Station Road Water Main Replacement Carol Lyons Awarded
3/28/2012 12-41 Oak Street Area Lead Service Renewals Terri Conner Awarded
3/28/2012 12-05 Cold Water Meters Terry Atwell Under Review
3/21/2012 12-40 Mary Street Area Lead Service Renewals Terry Atwell Awarded
3/21/2012 11-199 Distribution System Repairs & Capital Improvements Terry Atwell Awarded
2/29/2012 12-29 Overlook Acres Booster Pump Station Terry Atwell Awarded
2/29/2012 12-08 Security Services Carol Lyons Awarded
2/29/2012 11-47 Transylvania Beach Sanitary Sewer Carol Lyons Awarded
2/24/2012 12-13 Westside Drive Main Replacement Project Terry Atwell Awarded
2/15/2012 12-12 Shelby Street Area Service Renewals Project Terry Atwell Awarded